Equator 375 Wartungshandbuch

Stöbern Sie online oder laden Sie Wartungshandbuch nach Nein Equator 375 herunter. Equator 375 Service manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 33
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
SERVICE MANUAL
(TROUBLE SHOOTING AND REPAIRING TIPS)
Fourth Edition – February 2006
CONSERV REFRIGERATOR
MODELS
375 / 1200 SERIES ( OLD & NEW)
Seitenansicht 0
1 2 3 4 5 6 ... 32 33

Inhaltsverzeichnis

Seite 1 - SERVICE MANUAL

SERVICE MANUAL (TROUBLE SHOOTING AND REPAIRING TIPS) Fourth Edition – February 2006 CONSERV REFRIGERATOR MODELS 375 / 1200 SERIES ( OLD &

Seite 2

Disturbance Cause Trouble-shooting RemedyUnit has recently beenfille d w ith la rgequantities of food.Question user about useof unit immediately prior

Seite 3 - WARRANTY INFORMATION

1.2. Trouble-Shooting in the Electric Circuit.Before systematic trouble-shooting is commenced, check toensure that:- The fuses are intact.- The correc

Seite 4

1.3. Checking for Leakage to FrameFor checking whether there is leakage between the live partsand the frame, the insulation resistance can be tested u

Seite 5 - 1.1 Trouble-Shooting Chart

Starting device with HSTConnect a voltmeter between terminals 10 and 13 on the start-ing device. If no voltage can be measured, either the mainscable

Seite 6

1.6. The PTC Starting DeviceIt should be noted that starting device 1 03N001 2, which is usedfor the freezing compressor of refrigerator/freezer uprig

Seite 7

1.7. Using a Manometer in Trouble-ShootingThe pressure in a refrigerating system is directly dependent onthe temperature. For this reason, the manomet

Seite 8

Examples of trouble-shooting using a manometer on the suc-tion side (process pipe) and a service valve:1. The system is blocked.The suction pressure i

Seite 9

2. MAKING REPAIRS TO THE REFRIGERATINGSYSTEM2.1. Opening the Refrigerating System with Refrige-rant R600a (Isobutane) for RepairsThe Possibility of Fi

Seite 10

Actual EvacuationAfter mounting of the filling hose, the system is ready for theactual evacuation. Evacuate until a stable vacuum of 1 mbar hasbeen re

Seite 11

First Evacuation of Appliances with R600a in theSystem1. Drilling and tapping of filter drier, after thorough cleaningwhere the gasket of the tongs mu

Seite 13

The Blowing Process of the System. the Filling Sta-tion and the Vacuum Pumo and Opening of the Sys-tem7. Drilling and tapping of the process pipe.8. C

Seite 14 - The HST Starting Device

Actual Evacuation and Filling of R600a1. Mounting of the filling hose with spherical valve -see fig. 7. Thereafter, evacuate.2. Testing of the microsc

Seite 15

2.1.1. Opening the Refrigerating System for Repairswith Recovery of Refrigerant.If a hermetic refrigerating system is to function correctly andhave a

Seite 16 - . The system is blocked

Pinch the charging pipe with pliers. Remove the service valveand solder the hole together.Brush off all solderings in the system and check for possibl

Seite 17

Evacuation with Recovery of Refrigerant1. Drilling and tapping of filter drier after thoroughcleaning where the gasket of the tongs must be tight.2. M

Seite 18

Opening the System7. Drilling and tapping of process pipe.8. Connect dry nitrogen and equalize the pressure.9. Open the system with capillary tube sci

Seite 19

2.1.2. Emptying used Refrigerant to Pressure Vesselfrom Refrigerant BagConnect the suction valve on the emptying unit with hose to theoutlet valve on

Seite 20

2.1.3. Opening the Refrigerating System withRefrigerant R134a for RepairsAs R134a has other properties than the R12 used till now, it isimportant to n

Seite 21

2.2. Replacing the Filter DrierSome moisture and impurities will always be accumulated inthe filter drier, both from residue left in the system afteri

Seite 22

Capillary tube broken off without the use of special-purposepliers.Capillary tube broken off using special-purpose pliers orcapillary tube scissors.In

Seite 23

Your Equator appliance is protected by this warranty under normal,personal, family or household use (1 Year), and limited commercial use(90 days) in t

Seite 24

2.3. Replacing the CompressorIf trouble-shooting in the electric circuit or volumetricmeasurements indicate that the compressor is defective, a newcom

Seite 25

2.4. Replacing the EvaporatorThe pipe systems of all Vestfrost heat exchangers are mounted inplastic tubing with a diameter of 18/14.6 mm. It is there

Seite 26

2.5. Replacing the ThermostatUprightsDismount the phial tube and straighten out the phial. Draw offthe insulation, if any, around the phial. The phial

Seite 27

Positioning of the Thermostat Phial in NFG 307 from SerialNo. 501-----In order to ensure the proper functioning of the thermostat 90mm of the free end

Seite 29

Disturbance Cause Trouble-Shooting RemedyUnit does notrefrigerate or freeze,compressor does notoperate.Wall socket is dead. Check installation. Instal

Seite 30

Disturbance Cause Trouble-Shooting Reme dyOil present in systemafter horizontaltransport.Question user about modeof transportation and timeinterval be

Seite 31

Disturbance Cause Troubleshooting RemedyDefective thermostat. 1.Turn thermostat knob tozero. 2.Compressorcontinues to run.3.Dismount brown wire.4.Comp

Seite 32 - No. 501

Ditrubance Cause Trouble-shooting RemedyNo-FrostCheck if blade is lockedmechanically.Fittings for fan or airguiding duct are adjustedor replaced.Check

Seite 33

Disturbance Cause Trouble-shooting RemedyIce blockage incapillary tube.Heat injection area onevaporator with clothwith hot water. Ifrefrigerant now ca

Kommentare zu diesen Handbüchern

Keine Kommentare